Drainage works beside the Heysham to M6 link road, with excavators and concrete pipes on site.

UK construction sales intelligence

Construction sales intelligence that finds projects worth pursuing.

PlanningPing monitors UK planning applications, identifies relevant civils and groundworks opportunities, and uses AI to prioritise the projects most worth your sales team's time.

Try ST13, Coventry or Bristol — no account needed to look.

Example PlanningPing output

Planning applications turned into ranked sales leads in Coventry

Each row shows the likely work package, the matched trade signals and the timing. We scanned 1,562 planning records and found 130 potential opportunities matching civils, groundworks, drainage or enabling-work signals.

Sorted by fit
1Fit
AI-ranked leadLikely package: Drainage / water package

Submission of details to discharge condition No. 27 (watercourse crossings); imposed on planning permission reference OUT/2018/3225 granted on 03/06/2021 for residential led development of up to 2400 dwellings, including 'extra-care' accommodation; new vehicular access from the A45 and via Pickford Green Lane, with other non-vehicular access points; 15ha of employment land (B1, B2 and B8); a District Centre of approximately 10,000 sq.m. retail space; a Local Centre of approx. 1000 sq.m. local convenience retail plus other community facilities; provision of a Primary School; open spaces, substantial landscaping, green infrastructure and sports provision; earthworks including the provision of new drainage features; and associated demolition and groundworks.

Eastern Green, South Of A45, Coventry, CV5 7LGPL/2025/0002023/DCA

Matched trade signals

Drainage / SuDS scopeEarthworks / groundworks scopeFlood / water management scope

11mo

2Fit
AI-ranked leadLikely package: Drainage / water package

Submission of details to discharge condition Nos. 21 in part (investigation and risk assessment), for phase 4 and 5 only and conditions No. 25 (noise report) and 27 (watercourse crossings) for phase 4 only; imposed on planning permission reference OUT/2018/3225 granted on 20/11/2018 for residential led development of up to 2400 dwellings, Including 'extra-care' accommodation; new vehicular access from the A45 and via Pickford Green Lane, with other non-vehicular access points; 15ha of employment land (B1, B2 and B8); a District Centre of approximately 10,000 sq.m. retail space; a Local Centre of approx. 1000 sq.m. local convenience retail plus other community facilities; provision of a Primary School; open spaces, substantial landscaping, green infrastructure and sports provision; earthworks including the provision of new drainage features; and associated demolition and groundworks.

Eastern Green, South Of A45, Coventry, CV5 7LGPL/2025/0001663/DCA

Matched trade signals

Drainage / SuDS scopeEarthworks / groundworks scopeFlood / water management scope

13mo

3Fit
AI-ranked leadLikely package: Drainage / water package

Submission of details to discharge condition No. 10 (sustainable building statement); imposed on planning permission reference PL/2025/0001329/RVC granted on 19/12/2025 for Reserved Matters application for the construction of 491 dwellings, including appearance, layout, scale, landscaping, along with associated infrastructure to application OUT/2018/3225 granted 20/11/2018 for Residential led development of up to 2400 dwellings, Including 'extra-care' accommodation; new vehicular access from the A45 and via Pickford Green Lane, with other non-vehicular access points; 15ha of employment land (B1, B2 and B8); a District Centre of approximately10,000 sq.m. retail space; a Local Centre of approx. 1000 sq.m. local convenience retail plus other community facilities; provision of a Primary School; open spaces, substantial landscaping, green infrastructure and sports provision; earthworks including the provision of new drainage features; and associated demolition and groundworks. (Variation of condition Nos. 1 (approved plans), 2 (tree information), 6 (off plot planting), 17 (Acoustic Assessment) and 18 (CEMP): imposed on planning permission PL/2024/0001532/RESM granted on 25/04/2025 to allow for a section of phase 2 to be configured.)

Phase 2 And 3a Of Eastern Green Urban Extension, South Of A45, Coventry, CV5 7LGPL/2026/0000240/DCA

Matched trade signals

Drainage / SuDS scopeEarthworks / groundworks scopeInfrastructure / enabling works

7mo

Likely package

What a civils or groundworks team could sell into.

Matched signals

The words and conditions that made the application relevant.

Fit order

The examples are shown in the order PlanningPing would open first.

Showing 3 ranked examples. Create an account to see scores, project teams, recommended first contact and the full saved pipeline.
Photo: Ian Taylor / Geograph, CC BY-SA 2.0

Real public planning signal

A live view of the construction activity already sitting in planning records.

425+
UK planning authorities covered
6,733
public applications browsable now
251
open area pages
541
published in the last 30 days

Where PlanningPing is seeing activity

Every authority currently loaded in the public dataset, sized by application volume. It is a coverage picture, not a claim that every possible lead is already on this page.

Circle area is proportional to how many applications we hold for that authority. We can cover any of 425+ UK planning authorities on request — this shows the 36 where data is loaded today.

What PlanningPing finds

Real public applications from the register, translated into sales opportunities with the likely package and matched civils signals made visible.

See these scored and ranked
Sales opportunityUndecided

What to sell: Infrastructure package

Request for confirmation of compliance of conditions 7 (secure cycle parking), 8 (Landscaping) and 9 (Highway Works) attached to planning permission 23/82323/FUL (follow up to OTH/2026/0606)

Matched trade signals

Highways / access scope
Planning reference
OTH/2026/1260
Location
2-4 Barrfield Road, Salford, M6 7EL
Submitted
Submitted 10 days ago
Sales opportunityUndecided

What to sell: Infrastructure package

Application for a prior notification for the installation of 20m high telecommunications mast with associated antennas, transmission dishes, equipment cabinets and ancillary development works

Matched trade signals

Highways / access scope
Planning reference
2026/05630/PA
Location
Villa Road/Lozells Road Junction of Birmingham B19
Submitted
Submitted 10 days ago
Sales opportunityUndecided

What to sell: Groundworks package

Consent, agreement or approval required by conditions 2 (Contaminated land report), 3 (Remediation Statement), 4 (Verification report), 6 (Landscape works) and 8 (Off-site highway works) of Planning Application 25/05008/FU

Matched trade signals

Earthworks / groundworks scopeHighways / access scope
Planning reference
26/04834/COND
Location
150 Stoney Rock Lane Burmantofts Leeds LS9 7BL
Submitted
Submitted 2 weeks ago
Sales opportunityUndecided

What to sell: Infrastructure package

Consultation request from Bristol City Council on planning application 25/14175/P (Outline application for the development of up to 100, dwellings (Class C3) with associated landscaping, access, and infrastructure. All matters reserved other than the, details of the principal vehicle access from Elsbert Drive).

Matched trade signals

Infrastructure / enabling worksMajor development type
Planning reference
26/P/1787/SCON
Location
Land Adjacent To Elsbert Drive Bristol BS13 8AL
Submitted
Submitted 2 weeks ago
Sales opportunityUndecided

What to sell: Infrastructure package

Consent agreement or approval required by condition 8 (highway condition survey) to planning application 23/06280/FU

Matched trade signals

Highways / access scope
Planning reference
26/04778/COND
Location
Springfield House Hyde Street Woodhouse Leeds LS2 9LH
Submitted
Submitted 2 weeks ago
Sales opportunityUndecided

What to sell: Drainage / water package

Variation of condition 1 (approved plans) to previously approved Planning Application 24/05590/FU (Phased erection of industrial/warehouse buildings with ancillary office space with associated access; car parking; servicing; pedestrian infrastructure; drainage infrastructure; landscaping; and associated works.) for alterations including relocation and subdivision of air source heat pump zone and introduction of plant compounds and CCTV; extension of existing landing and removal of a retaining wall; revisions to parking layout; new arrangement of louvres, door and windows

Matched trade signals

Drainage / SuDS scopeStructural / retaining scopeInfrastructure / enabling works
Planning reference
26/04822/FU
Location
Leeds Valley Park Savannah Way Rothwell Leeds LS10 1AB
Submitted
Submitted 3 weeks ago

How planning activity becomes pipeline

Every step below is something the system actually does, every morning, without anyone asking it to.

  1. 01

    Planning registers update

    New and changed UK applications are collected from the authorities in your patch.

  2. 02

    Scope is pulled out

    Descriptions, documents and conditions are checked for groundworks, drainage, highways and structures.

  3. 03

    Projects are prioritised

    The list is scored for civils relevance, location and timing so sales time goes where it has a chance.

  4. 04

    Your team acts

    Open the record, check the agent, track the lead and approach before the tender noise starts.

Built around the work, not the software category

The page a sales manager needs is not another AI dashboard. It is a sharp read on which planning records point to real packages in the sectors their team can win.

Excavator and dumper working on a rural housing development.

Residential Development

New estates, reserved matters, discharge of conditions, access roads, drainage strategy and plot infrastructure.

Sector image: Stonewater
Commercial construction in London with cranes above a partly complete building.

Commercial & Industrial

Warehousing, employment land, mixed-use schemes, steel frames, service yards and enabling packages.

Sector image: Damo1977 / CC BY

The intelligence layer

Planning records are public. Knowing which ones matter is the product.

A council register tells you an application exists. PlanningPing turns that public record into construction sales intelligence: scope, timing, place, agent and next action, all kept close to the original source.

Learn about construction sales intelligence

Civils relevance

Groundworks, drainage, SuDS, highways and structures are treated as selling signals, not search keywords.

Scope reasoning

Matched scope tags show why a record has been surfaced before the numerical score is revealed inside the app.

Pipeline-ready

Track a lead from first sighting to outreach, follow-up and won or lost without leaving the opportunity.

Territory-first

Search and monitoring begin with the towns, postcodes and authorities your team can actually serve.

UK-built, source-led

Small enough to be accountable. Serious enough to be checked.

PlanningPing is operated in the UK by William Kelsall / Planning Ping, trading as Kelwave. Questions go to the same place as the legal pages: william.kelwave@gmail.com.

The standard is simple: planning intelligence should be useful enough to act on and transparent enough to verify.

Public planning sources

References, authorities and application dates stay visible so a lead can be checked back to the register.

No invented market theatre

No fake testimonials, mystery user counts or unsupported national claims. The page uses the data we can defend.

Built around UK territories

The product starts with the patch your sales team can actually cover, then expands from there.

How we compare

Barbour ABI and Glenigan are the established names. They are bigger than us and we are not pretending otherwise — the difference is who the product is tuned for, and how you buy it.

PlanningPing compared with Barbour ABI and Glenigan
 Barbour ABI · GleniganPlanningPing
How you buy itBook a demo, quote on requestPublished price, start free, no call
PriceNot publishedFrom £29/month
Built forThe whole construction marketCivils, groundworks and drainage subcontractors
What it tells youWhat is being built, in depthWhich schemes carry your scope, and why
Depth of dataLarger, with research teams behind itPlanning applications and public tenders
ContractTypically annualMonthly, cancel anytime

Checked against their own public pages, August 2026. Barbour ABI publishes no pricing page; Glenigan’s states it is “difficult to quote exact numbers”. They hold more data than we do — if you need whole-market coverage with a research team behind it, they are the right tool. We are for firms who want to know which of this week’s applications carry drainage or groundworks. Start free.

Pricing

Start free. Upgrade when the scored pipeline is worth tracking every morning.

Free

Free

forever

  • Track schemes near you
  • 1km radius, 1 tracked area
  • Weekly email digest
Start free

Pro

£29/month

or £290/year (2 months free) · 14-day free trial, no card required

  • Everything in Free
  • Lead scoring, pipeline (CRM), AI outreach
  • 3km radius, 3 tracked areas
  • Standard support
Start free trial
14-day trial

Max

£59/month

or £590/year (2 months free) · 14-day free trial, no card required

  • Everything in Pro
  • 5km radius, unlimited tracked areas
  • Priority support
Start free trial

See what’s being built in your territory.

No account needed to look. Start tracking when you want it every morning.